Tuesday, December 21, 2010

Lithium Drive: Jay Leno picks up his Chevrolet Volt tnr.v, czx.v, rm.v, lmr.v, alk.ax, sqm, fmc, roc, clq.v, wlc.v, tsla, li.v, lit, nsany, rno.pa, bmw, f, gm, avl.to, ree, res.v, quc.v, dai, byddf



  This is the future - according to Jay Leno and "Huston, we have a problem" - according to Steven Chu:


  U.S. secretary of Energy Steven Chu on Peak Oil and Energy. For our investment thesis and Next Big Thing it is the very important speech and comparing Peak Oil situation and Energy Security to "Sputnik Moment" by Steven Chu is very timely. We are advocating here for the state-level comprehensive plan to save America, like it is implemented now in China. Just listen to the US Secretary of Energy describing what China is doing now and how far it has surpassed U.S. already!
  We all need to waken up as with Russian Sputnik flying above us and implement complex electrification of our transportation with the same devotion and allocation of necessary resources as "Manhattan project" was done. This time it can save the world as we know it.
  Watch the second video from Cancun below, where Steven Chu talks about Oil as per IEA groundbreaking revelations about Peak Oil:  "Oil prices will be higher from now on."


"This year we have a staggering number of reports and warning on the looming Peak Oil situation. It takes time for reality to settle in, particularly, when nobody knows what to do with it. We have put REE in the headline and only few months ago we would have to explain, what is it all about - now suddenly everybody is talking about REE and stocks involved in Rare Earths are all making new highs. It takes a crisis for us to realise that fundamentals are driving the real trends. Sudden realisation that China controls more than 90% of REE market and their reserves maybe will last only for another twenty years, created the catalyst in the market place. What will it take to realise that we are running out of cheap oil? Another crisis?
  We are talking here about the powerful mega trend Inflation multiplied by Peak Oil situation - we have to move and readjust our society. Our Energy diet is not sustainable any more. We are lucky in a sense that there is technology available to us to survive the Oil Shock if we will all move fast - Electric Cars. It is our Next Big Thing and at the heart of this disruptive technology lie strategic commodities: REE and Lithium."


  The sector is very small - now is the time to find and pick up value among the hype, backed by strong  shareholders and based on solid portfolio of Lithium and REE properties. Headlines from China, Jim Puplava and James Dines are moving REE into the mainstream in the investment space now and Lithium will get its recognition one day as well. Only few companies left without strategic investors in the sector, when even only this catalyst can bring the transformation to the junior from a holding company into actively pushing into production developer. It will bring multiples to the dormant valuation.

  We will provide some links for the further homework here:











  Our Top Picks from Lithium Bull: Rest Before The Charge have already enjoyed a very active M&A season, out of the two - Rodinia Lithium has already secured strategic investor and only International Lithium left for dating now. Among the strategic suitors are the same faces - people with money vs others with debt."

 Here are another groundbreaking revelations about Peak Oil and Climate Change now from U.S. Secretary of Energy!

Enhanced by Zemanta

Monday, December 20, 2010

TNR Gold: Minera Andes Updates Preliminary Assessment for Los Azules Project, estimates $2.8-billion Los Azules NPV tnr.v, abx, ng.to, mai.to, cuu.v, sgc.v, tck, bhp, fcx, rtp, nem, auy, slw, cs.to, ngq.to, imn.to, ncu.to, bls.to, qux.to, wrn.to, rio



Vancouver B.C.: TNR Gold Corp. ("TNR" or the "Company") announces that it has become aware of a news release issued by Minera Andes Inc. (“MAI”) on December 16, 2010 disclosing results of an updated preliminary assessment at the Los Azules project (“Project”). 
As most recently disclosed by the Company in its press release of November 4, 2010, the Company is involved in a legal dispute with MAI regarding TNR’s interest in the Project. As a result, a qualified person of TNR (within the meaning of National Instrument 43-101) has not been able to verify the information disclosed by MAI, and, thus, such information should not be relied upon by TNR shareholders.
The Los Azules project is an advanced exploration project in Argentina. TNR’s wholly owned subsidiary, Solitario Argentina S.A., has served notice exercising its 25 per-cent back-in right to certain of the properties comprising the Project. Solitario’s right to back into the properties is the subject of a lawsuit filed by Minera Andes, and the terms of the back in right are the subject of litigation between Solitario and Xstrata. 
We encourage interested parties to review the Amended Statement of Defence and Counterclaim in their entirety on our website for a better understating of our position. The link for this information is as follows:

It should be noted that the Statement of Defence and Counterclaim are not intended to be, and should not be interpreted as, sources of factual, business or operational information about TNR or any of its affiliates. The Statement of Defence and Counterclaim contain assertions that have been prepared solely for use in connection with the legal dispute with MAI and Xstrata, have not been proven and should, therefore, not be relied upon.





ABOUT TNR GOLD CORP.
The Company is a diversified international metals exploration company focusing on the continued advancement of existing properties and identifying and acquiring new prospective projects. The Company has a portfolio of 18 active projects, of which the rights to 9 rare metals projects, including Mariana, will be transferred to the wholly owned subsidiary International Lithium Corp. upon completion of a proposed plan of arrangement.
The objective of the proposed plan of arrangement is to spin out the Company's rare metals property interests into a separate public company, International Lithium Corp. This proposed plan of arrangement has been approved by the Company's shareholders and the courts of British Columbia. The Company will now proceed with the spin out and will provide updates on the progress of the spinout in further news releases. For further details of the spinout, please refer to Stockwatch news dated May 26, 2010, or visit International Lithium's website.
The recent acquisition of lithium, other rare metals and rare-earth elements projects in Argentina, Canada, USA and Ireland confirms the combined companies' commitments to generating projects, diversifying its markets, and building shareholder value.

On behalf of the board,

Gary Schellenberg
President"


  News from Los Azules are getting better and better - now we have a new PA with increased NPV of this project from just under 500 million to 2.8 billion us dollars! Two out of five planned drills will be on the site shortly and deposit will grow even more in its size.



  Now we can realise why TNR Gold was so determined in its legal fight for the back-in right into this deposit. At stake now is up to 15% of the project (12.5% technically, but with high grade core on the former TNR Gold - Xstrata land) with value of 420 million dollars, according to this latest estimations from Minera Andes. There is a legal risk in every lawsuit and our position is that the court should always decide about the property ownership between TNR Gold and Minera Andes, but for the junior with market cap just over 20 million CAD it could be a very important development - the higher the value of the prise the higher the chances of out-of-the-court settlement. We will be really surprised if Rob McEwen will drag this project along into the court battle - which date is set for the June 2011 - increasing its value further with announced drilling program.
  George Macintosh Q.C. is leading TNR Gold litigation team. His personal engagement and new twist in litigation strategy, "that "production of a feasibility study, whether produced within 36 months or some other time, was a condition solely for the benefit of Solitario (TNR Gold sub - S.), and as such, could be waived" - provides nessesary support that TNR Gold legal claims to the part of 2.8 billion NPV story of Los Azules should be taken seriously. 
30 NOVEMBER 2010

BEST LAWYERS NAMES GEORGE MACINTOSH AS ONE OF THE 2011 LAWYERS OF THE YEAR

Best Lawyers, the oldest peer-review publication in the legal profession, has named George Macintosh, Q.C. as the “Vancouver Best Lawyers Bet-the-Company Litigator of the Year” for 2011.
“The lawyers being honoured as “Lawyers of the Year” have received particularly high ratings in our surveys by earning a high level of respect among their peers for their abilities, professionalism, and integrity” states Best Lawyers.
To view a copy of George Macintosh’s biography please click here.  
  The recent professional award shows that TNR Gold shareholders are in the right company to defend thier property rights in this legal case, which some people are already calling "MAI's bullying tactics are on trial here. It is truly a 'David and Goliath' case."  We will address you to the Statement of Defence by TNR Gold and Los Azules propery maps on the links below to make you own conclusions, as always.

"TNR Gold Corp.'s litigation in the Supreme Court of British Columbia related to the LosAzules project in Argentina, involving TNR, Minera Andes Inc., MIM ArgentinaExploraciones S.A. (Xstrata) and related entities, has been joined for hearing and scheduled for a new trial date of June 20 to July 15, 2011. The trial will be held in Vancouver."


"It is important to remember, that now, according to this NR, all litigation around Los Azules between TNR Gold, Minera Andes and Xstrata is joined in one trial and TNR Gold will seek, according to the Statement of Defence above, not only rectification of the option agreement to reflect its true intentions - without 36 months condition, but that "production of a feasibility study, whether produced within 36 months or some other time, was a condition solely for the benefit of Solitario (TNR Gold sub - S.), and as such, could be waived".


Also at stake is Escorpio IV property: 
"We did not understand why Minera Andes did not accepted the back in right by TNR Gold and lost opportunity to consolidate the project and secure a very important Escorpio IV property, where according to Minera Andes mining plan part of mining facilities supposed to be located, but Rob McEwen must has his own strategy. With this kind of presentation it will be not cheap any more to settle out of the court, but it is always better then drag such a project in litigation for years to come."



"Los Azules emerges in this light as a very important Copper deposit with a lot of upside in its valuation among the leaders in this particular quality, relatively high CAPEX requirements, but in the solid middle or to the higher band in a lot of different investment metrics compare to the other juniors in the analysis provided by CIBC."

It is very important that, according to CIBC report page 42, legal claims of TNR Gold are communicated properly within the industry now. Junior can fully rely on its litigation strategy, court decision or potential out-of-the-court settlement, should Minera Andes decide to clean the house before calling the real estate agents. 
We will always leave it to the lawyers and court to decide - who owns what in this case in its proper time.
Copper is going up and the deposit is growing - we guess that nobody is in a hurry here. Argentina will become more fluent in Mandarin and the value of every lb of Copper in the ground will go up - to reflect fundamental picture described in the CIBC report."

Please, do not forget, that we own stocks we are writing about and have position in these companies. We are not providing any investment advise on this blog and there is no solicitation to buy or sell any particular company here. Always consult with your qualified financial adviser before making any investment decisions.


MineWeb:

Minera Andes Los Azules deposit could be major copper mine - McEwen



Minera Andes CEO Rob McEwen says the company's Los Azules property lies among the world's copper giants. A preliminary assessment suggests it also may be a candidate.


Minera Andes estimates $2.8-billion (U.S.) Azules NPV
2010-12-16 16:12 ET - News Release


Mr. James Duff reports

MINERA ANDES ANNOUNCES UPDATED PRELIMINARY ASSESSMENT FOR ITS LOS AZULES COPPER DEPOSIT

Minera Andes Inc. has released the results of an updated preliminary assessment on its 100-per-cent-owned Los Azules copper project located in the San Juan province of western-central Argentina. It is based on the updated resource estimate announced in Stockwatch in June, 2010, and higher base case metal price assumptions. Amounts are in U.S. dollars unless otherwise stated.

Highlights using a copper price of $3 per pound

Base case pretax net present value is $2.8-billion, and the internal rate of return is 21.4 per cent at a discount rate of 8 per cent.
Life-of-mine cash operating costs are 96 cents per pound of copper, net of gold and silver byproduct credits.
Initial capital is $2.9-billion.
Capital payback is in three years.
Mine life is 25 years.
Rob McEwen, chairman and chief executive officer of Minera Andes, said: "We are advancing the engineering studies on Los Azules to systematically derisk the project. The field season is just getting under way, and we are currently mobilizing the first two of five drill rigs to the project. In addition to continuing the infill and step-out drilling, we will start to test some of the newly identified deeper geophysical targets this season."

Los Azules copper project is an advanced-stage porphyry copper exploration project located in the cordilleran region of San Juan province, Argentina, near the border with Chile. The deposit is a typical porphyry copper system in that the upper part of the system consists of a barren leached cap, which is underlain by a high-grade secondary enrichment blanket, and the primary mineralization below the secondary enrichment zone extends to at least 650 metres, which are the depth of the deepest holes drilled to date. The deposit is approximately one kilometre wide by four kilometres long, and it is open in several directions.

Highlights of the updated preliminary assessment are shown in the attached table. Details may be found in an updated technical report which will be posted on SEDAR following the issuance of this news release.

PRELIMINARY ASSESSMENT HIGHLIGHTS

NPV ($3/lb Cu, 8-per-cent discount rate) $2,826-million
IRR 21.4%
Initial capital expenditure $2,851-million
LOM average operating costs $7.82/t ore
LOM C-1 cash costs (net byproduct credits) $0.96/lb Cu mined
Nominal mill capacity 100,000 tpd
Annual throughput 36 million tonnes
Mine life 25.4 years
Life-of-mine strip ratio 1.37
LOM average annual copper-in-concentrate production 169,100 tonnes
First five years average annual copper-in-concentrate
production 226,500 tonnes

All monetary amounts are expressed in U.S. dollars unless otherwise stated.
The PA is preliminary in nature and includes the use of inferred resources,
which are considered too speculative geologically to have the economic
considerations applied to them that would enable them to be categorized as
mineral reserves. Thus, there is no certainty that the results of the PA
will be realized. Actual results may vary, perhaps materially. The level of
accuracy for preliminary assessment estimates is approximately plus or
minus 35 per cent.
Compared with the previous preliminary assessment released in March, 2009, the net present value discounted at 8 per cent has increased to $2.9-billion from $496-million, and the internal rate of return has increased to 21.4 per cent from 10.8 per cent. In addition, the payback of preproduction capital has decreased to 3.1 years from 6.4 years from the start of production.

The main driver of the improved project economics is that the base case copper price has been increased from $1.90 per pound to $3 per pound. Specifically the higher copper price added approximately $3.2-billion to the NPV, and the increased resources added approximately $2.1-billion.

The benefits of the higher copper price and increased resources were significantly offset by increases in the estimated operating costs ($695-million), capital costs ($100-million), and export retention taxes and royalties ($3.4-billion).

The updated preliminary assessment also incorporates updated property status and ownership information, revised locations for the project facilities, and an updated geological interpretation.

Project economics

The preliminary assessment contains a cash flow valuation model based upon the geological and engineering work completed to date and technical and cost inputs developed by Samuel Engineering Inc., Ausenco Vector and MTB Project Management Professionals Inc. The base case was developed using long-term forecast metal prices of $3 per pound for copper, $980 per ounce for gold and $15.60 per ounce for silver.

This news release has been submitted by Jim Duff, chief operating officer of the corporation. For further information, please contact Mr. Duff, or visit the company website.

Scientific and technical information

The information presented in this press release has been reviewed and approved by the qualified persons responsible for the technical report that presents the results of the updated preliminary assessment. They are: Kathleen Altman, PhD, PE, Robert Sim, PGeo, Bruce Davis, PhD, FAusIMM, Richard Jemielita, PhD, MIMMM, William Rose, PE, and Scott Elfen, PE. All are independent qualified persons as defined by National Instrument 43-101 (standards of disclosure for mineral projects). Mr. Sim, Mr. Davis and Mr. Rose are responsible for the mineral resource estimate. Mr. Davis is responsible for the quality control for the assaying of Los Azules drill core. All samples were collected in accordance with industry standards. Splits from the drill core samples were submitted to the ACME sample preparation laboratory in Mendoza, Argentina, and then transferred to ACME's laboratory in Santiago, Chile, for fire assay and ICP analysis. Accuracy of results is tested through the systematic inclusion of standards, blanks and check assays. Mr. Rose is responsible for developing the mine production schedule and participating in the resource estimate. Mr. Elfen of Ausenco Vector is responsible for information about environmental liabilities, environmental permitting and the geotechnical designs used for the study. Mr. Jemielita is responsible for information about the geological setting, deposit types, mineralization, exploration and drilling. Ms. Altman, Samuel Engineering, is the principal author of the report with specific responsibility for mineral processing and metallurgical testing, the capital and operating cost estimates, and the economic evaluation.

Mineral resources are generated using ordinary kriging with a nominal block size of 20 by 20 by 15 metres. Block grade estimates are derived from drill hole sample results and the interpretation of a geologic model, which relates to the spatial distribution of copper, gold, silver and molybdenum in the deposit. There are a total of 114 drill holes in Los Azules database with a cumulative length of 30,997 metres and a total of 15,260 samples analyzed for a suite of elements, including total copper, gold, silver and molybdenum. A total of 58 of the drill holes have some portion of the sample intervals tested for sequential copper analysis. This information contributed to the development of the mineral zone domains. The portion of the new mineral resource that has been defined as indicated is based on a drilling configuration that exhibits the degree of continuity required for higher-level mineral resources. Inferred mineral resources are limited to blocks within a maximum distance of 200 metres from a drill hole. As required by NI 43-101, the possible future economic viability of the mineral resource has been exhibited by restriction within a pit shell derived about the copper content in indicated and inferred class blocks at a copper price of $2.50 per pound, total operating costs of $5.25 per tonne and an average pit slope of 34 degrees. Mineral resources are presented at a cut-off grade of 0.35 per cent copper, which is the same base cut-off grade used in the 2008 mineral resource estimate. These are mineral resources, not mineral reserves.

For further information in respect of Los Azules project, please refer to the technical report entitled, "Canadian National Instrument 43-101 technical report, updated preliminary assessment, Los Azules project, San Juan province, Argentina," dated Dec. 1, 2010. This report will be made available on SEDAR concurrent with the filing of this news release.

We seek Safe Harbor.


Enhanced by Zemanta

Lithium Drive: Who Killed The Electric Car? tnr.v, czx.v, rm.v, lmr.v, alk.ax, sqm, fmc, roc, clq.v, wlc.v, tsla, li.v, lit, nsany, rno.pa, bmw, f, gm, avl.to, ree, res.v, quc.v, dai, byddf



    We have already been there - you can see almost all movie here: Who Killed The Electric Car - now it is our choice  and this revolution can not be stopped, but we need to move it forward in order to happen it here as well. China and Asia in general are taking this challenge very seriously and moving fast into he post carbon society building electric cars, batteries and supplies of strategic commodities like Lithium and REE.

Maybe, one of the first time in the history, you personal choice of mobility can change the history and make your home a better place. We can start the move to post carbon society today, while still enjoying the freedom of personal mobility.
Official portrait of United States Secretary o...Image via Wikipedia
Last week we had a groundbreaking admition from the U.S. Secretary of Energy Dr. Steven Chu about Peak Oil and his prediction that "Oil prices will go higher from here" - have you read about it in the headlines, hardly, but you can still listen to him here.
"This year we have a staggering number of reports and warning on the looming Peak Oil situation. It takes time for reality to settle in, particularly,when nobody knows what to do with it. We have put REE in the headline and only few months ago we would have to explain, what is it all about - now suddenly everybody is talking about REE and stocks involved in Rare Earths are all making new highs. It takes a crisis for us to realise that fundamentals are driving the real trends. Sudden realisation that China controls more than 90% of REE market and their reserves maybe will last only for another twenty years, created the catalyst in the market place. What will it take to realise that we are running out of cheap oil? Another crisis?
  We are talking here about the powerful mega trend Inflation multiplied by Peak Oil situation - we have to move and readjust our society. Our Energy diet is not sustainable any more. We are lucky in a sense that there is technology available to us to survive the Oil Shock if we will all move fast - Electric Cars. It is our Next Big Thing and at the heart of this disruptive technology lie strategic commodities: REE and Lithium."
  The sector is very small - now is the time to find and pick up value among the hype, backed by strong  shareholders and based on solid portfolio of Lithium and REE properties. Headlines from China, Jim Puplava and James Dines are moving REE into the mainstream in the investment space now and Lithium will get its recognition one day as well. Only few companies left without strategic investors in the sector, when even only this catalyst can bring the transformation to the junior from a holding company into actively pushing into production developer. It will bring multiples to the dormant valuation. We will provide some links for the further homework here:"



Enhanced by Zemanta

Saturday, December 18, 2010

Lithium Drive: Roadfly.com - 2011 Nissan LEAF Electric Car Road Test & Review tnr.v, czx.v, rm.v, lmr.v, alk.ax, sqm, fmc, roc, clq.v, wlc.v, tsla, li.v, lit, nsany, rno.pa, bmw, f, gm, avl.to, ree, res.v, quc.v, dai, byddf



 
   Nissan Leaf is already part of the history - you can make it the start of something bigger than just innovation, you can start the Electric Revolution with your personal choice.
   It is important to note that you have to account Federal Tax Rebate for 7,500 dollars and in some states like California, lucky people can buy this Electric Car for just over 20,000 dollars, utilising State Tax Rebate of additional 5,000 dollars.
  Maybe, one of the first time in the history, you personal choice of mobility can change the history and make your home a better place. We can start the move to post carbon society today, while still enjoying the freedom of personal mobility.
Official portrait of United States Secretary o...Image via Wikipedia
Last week we had a groundbreaking admition from the U.S. Secretary of Energy Dr. Steven Chu about Peak Oil and his prediction that "Oil prices will go higher from here" - have you read about it in the headlines, hardly, but you can still listen to him here.







"This year we have a staggering number of reports and warning on the looming Peak Oil situation. It takes time for reality to settle in, particularly,when nobody knows what to do with it. We have put REE in the headline and only few months ago we would have to explain, what is it all about - now suddenly everybody is talking about REE and stocks involved in Rare Earths are all making new highs. It takes a crisis for us to realise that fundamentals are driving the real trends. Sudden realisation that China controls more than 90% of REE market and their reserves maybe will last only for another twenty years, created the catalyst in the market place. What will it take to realise that we are running out of cheap oil? Another crisis?
  We are talking here about the powerful mega trend Inflation multiplied by Peak Oil situation - we have to move and readjust our society. Our Energy diet is not sustainable any more. We are lucky in a sense that there is technology available to us to survive the Oil Shock if we will all move fast - Electric Cars. It is our Next Big Thing and at the heart of this disruptive technology lie strategic commodities: REE and Lithium."
  The sector is very small - now is the time to find and pick up value among the hype, backed by strong  shareholders and based on solid portfolio of Lithium and REE properties. Headlines from China, Jim Puplava and James Dines are moving REE into the mainstream in the investment space now and Lithium will get its recognition one day as well. Only few companies left without strategic investors in the sector, when even only this catalyst can bring the transformation to the junior from a holding company into actively pushing into production developer. It will bring multiples to the dormant valuation. We will provide some links for the further homework here:"


Enhanced by Zemanta

Friday, December 17, 2010

TNR Gold: Los Azules: Minera Andes estimates $2.8-billion (U.S.) Los Azules NPV tnr.v, abx, ng.to, mai.to, cuu.v, sgc.v, tck, bhp, fcx, rtp, nem, auy, slw, cs.to, ngq.to, imn.to, ncu.to, bls.to, qux.to, wrn.to, rio




  News from Los Azules are getting better and better - now we have a new PA with increased NPV of this project from just under 500 million to 2.8 billion us dollars! Two out of five planned drills will be on the site shortly and deposit will grow even more in its size.



  Now we can realise why TNR Gold was so determined in its legal fight for the back-in right into this deposit. At stake now is up to 15% of the project (12.5% technically, but with high grade core on the former TNR Gold - Xstrata land) with value of 420 million dollars, according to this latest estimations from Minera Andes. There is a legal risk in every lawsuit and our position is that the court should always decide about the property ownership between TNR Gold and Minera Andes, but for the junior with market cap just over 20 million CAD it could be a very important development - the higher the value of the prise the higher the chances of out-of-the-court settlement. We will be really surprised if Rob McEwen will drag this project along into the court battle - which date is set for the June 2011 - increasing its value further with announced drilling program.
  George Macintosh Q.C. is leading TNR Gold litigation team. His personal engagement and new twist in litigation strategy, "that "production of a feasibility study, whether produced within 36 months or some other time, was a condition solely for the benefit of Solitario (TNR Gold sub - S.), and as such, could be waived" - provides nessesary support that TNR Gold legal claims to the part of 2.8 billion NPV story of Los Azules should be taken seriously. 
30 NOVEMBER 2010

BEST LAWYERS NAMES GEORGE MACINTOSH AS ONE OF THE 2011 LAWYERS OF THE YEAR

Best Lawyers, the oldest peer-review publication in the legal profession, has named George Macintosh, Q.C. as the “Vancouver Best Lawyers Bet-the-Company Litigator of the Year” for 2011.
“The lawyers being honoured as “Lawyers of the Year” have received particularly high ratings in our surveys by earning a high level of respect among their peers for their abilities, professionalism, and integrity” states Best Lawyers.
To view a copy of George Macintosh’s biography please click here.  
  The recent professional award shows that TNR Gold shareholders are in the right company to defend thier property rights in this legal case, which some people are already calling "MAI's bullying tactics are on trial here. It is truly a 'David and Goliath' case."  We will address you to the Statement of Defence by TNR Gold and Los Azules propery maps on the links below to make you own conclusions, as always.

"TNR Gold Corp.'s litigation in the Supreme Court of British Columbia related to the Los Azules project in Argentina, involving TNR, Minera Andes Inc., MIM Argentina Exploraciones S.A. (Xstrata) and related entities, has been joined for hearing and scheduled for a new trial date of June 20 to July 15, 2011. The trial will be held in Vancouver."


"It is important to remember, that now, according to this NR, all litigation around Los Azules between TNR Gold, Minera Andes and Xstrata is joined in one trial and TNR Gold will seek, according to the Statement of Defence above, not only rectification of the option agreement to reflect its true intentions - without 36 months condition, but that "production of a feasibility study, whether produced within 36 months or some other time, was a condition solely for the benefit of Solitario (TNR Gold sub - S.), and as such, could be waived".


Also at stake is Escorpio IV property: 
"We did not understand why Minera Andes did not accepted the back in right by TNR Gold and lost opportunity to consolidate the project and secure a very important Escorpio IV property, where according to Minera Andes mining plan part of mining facilities supposed to be located, but Rob McEwen must has his own strategy. With this kind of presentation it will be not cheap any more to settle out of the court, but it is always better then drag such a project in litigation for years to come."



"Los Azules emerges in this light as a very important Copper deposit with a lot of upside in its valuation among the leaders in this particular quality, relatively high CAPEX requirements, but in the solid middle or to the higher band in a lot of different investment metrics compare to the other juniors in the analysis provided by CIBC."

It is very important that, according to CIBC report page 42, legal claims of TNR Gold are communicated properly within the industry now. Junior can fully rely on its litigation strategy, court decision or potential out-of-the-court settlement, should Minera Andes decide to clean the house before calling the real estate agents. 
We will always leave it to the lawyers and court to decide - who owns what in this case in its proper time.
Copper is going up and the deposit is growing - we guess that nobody is in a hurry here. Argentina will become more fluent in Mandarin and the value of every lb of Copper in the ground will go up - to reflect fundamental picture described in the CIBC report."

Please, do not forget, that we own stocks we are writing about and have position in these companies. We are not providing any investment advise on this blog and there is no solicitation to buy or sell any particular company here. Always consult with your qualified financial adviser before making any investment decisions.


MineWeb:




Minera Andes Los Azules deposit could be major copper mine - McEwen

Minera Andes CEO Rob McEwen says the company's Los Azules property lies among the world's copper giants. A preliminary assessment suggests it also may be a candidate.






Minera Andes estimates $2.8-billion (U.S.) Azules NPV
2010-12-16 16:12 ET - News Release


Mr. James Duff reports

MINERA ANDES ANNOUNCES UPDATED PRELIMINARY ASSESSMENT FOR ITS LOS AZULES COPPER DEPOSIT

Minera Andes Inc. has released the results of an updated preliminary assessment on its 100-per-cent-owned Los Azules copper project located in the San Juan province of western-central Argentina. It is based on the updated resource estimate announced in Stockwatch in June, 2010, and higher base case metal price assumptions. Amounts are in U.S. dollars unless otherwise stated.

Highlights using a copper price of $3 per pound

Base case pretax net present value is $2.8-billion, and the internal rate of return is 21.4 per cent at a discount rate of 8 per cent.
Life-of-mine cash operating costs are 96 cents per pound of copper, net of gold and silver byproduct credits.
Initial capital is $2.9-billion.
Capital payback is in three years.
Mine life is 25 years.
Rob McEwen, chairman and chief executive officer of Minera Andes, said: "We are advancing the engineering studies on Los Azules to systematically derisk the project. The field season is just getting under way, and we are currently mobilizing the first two of five drill rigs to the project. In addition to continuing the infill and step-out drilling, we will start to test some of the newly identified deeper geophysical targets this season."

Los Azules copper project is an advanced-stage porphyry copper exploration project located in the cordilleran region of San Juan province, Argentina, near the border with Chile. The deposit is a typical porphyry copper system in that the upper part of the system consists of a barren leached cap, which is underlain by a high-grade secondary enrichment blanket, and the primary mineralization below the secondary enrichment zone extends to at least 650 metres, which are the depth of the deepest holes drilled to date. The deposit is approximately one kilometre wide by four kilometres long, and it is open in several directions.

Highlights of the updated preliminary assessment are shown in the attached table. Details may be found in an updated technical report which will be posted on SEDAR following the issuance of this news release.

PRELIMINARY ASSESSMENT HIGHLIGHTS

NPV ($3/lb Cu, 8-per-cent discount rate) $2,826-million
IRR 21.4%
Initial capital expenditure $2,851-million
LOM average operating costs $7.82/t ore
LOM C-1 cash costs (net byproduct credits) $0.96/lb Cu mined
Nominal mill capacity 100,000 tpd
Annual throughput 36 million tonnes
Mine life 25.4 years
Life-of-mine strip ratio 1.37
LOM average annual copper-in-concentrate production 169,100 tonnes
First five years average annual copper-in-concentrate
production 226,500 tonnes

All monetary amounts are expressed in U.S. dollars unless otherwise stated.
The PA is preliminary in nature and includes the use of inferred resources,
which are considered too speculative geologically to have the economic
considerations applied to them that would enable them to be categorized as
mineral reserves. Thus, there is no certainty that the results of the PA
will be realized. Actual results may vary, perhaps materially. The level of
accuracy for preliminary assessment estimates is approximately plus or
minus 35 per cent.
Compared with the previous preliminary assessment released in March, 2009, the net present value discounted at 8 per cent has increased to $2.9-billion from $496-million, and the internal rate of return has increased to 21.4 per cent from 10.8 per cent. In addition, the payback of preproduction capital has decreased to 3.1 years from 6.4 years from the start of production.

The main driver of the improved project economics is that the base case copper price has been increased from $1.90 per pound to $3 per pound. Specifically the higher copper price added approximately $3.2-billion to the NPV, and the increased resources added approximately $2.1-billion.

The benefits of the higher copper price and increased resources were significantly offset by increases in the estimated operating costs ($695-million), capital costs ($100-million), and export retention taxes and royalties ($3.4-billion).

The updated preliminary assessment also incorporates updated property status and ownership information, revised locations for the project facilities, and an updated geological interpretation.

Project economics

The preliminary assessment contains a cash flow valuation model based upon the geological and engineering work completed to date and technical and cost inputs developed by Samuel Engineering Inc., Ausenco Vector and MTB Project Management Professionals Inc. The base case was developed using long-term forecast metal prices of $3 per pound for copper, $980 per ounce for gold and $15.60 per ounce for silver.

This news release has been submitted by Jim Duff, chief operating officer of the corporation. For further information, please contact Mr. Duff, or visit the company website.

Scientific and technical information

The information presented in this press release has been reviewed and approved by the qualified persons responsible for the technical report that presents the results of the updated preliminary assessment. They are: Kathleen Altman, PhD, PE, Robert Sim, PGeo, Bruce Davis, PhD, FAusIMM, Richard Jemielita, PhD, MIMMM, William Rose, PE, and Scott Elfen, PE. All are independent qualified persons as defined by National Instrument 43-101 (standards of disclosure for mineral projects). Mr. Sim, Mr. Davis and Mr. Rose are responsible for the mineral resource estimate. Mr. Davis is responsible for the quality control for the assaying of Los Azules drill core. All samples were collected in accordance with industry standards. Splits from the drill core samples were submitted to the ACME sample preparation laboratory in Mendoza, Argentina, and then transferred to ACME's laboratory in Santiago, Chile, for fire assay and ICP analysis. Accuracy of results is tested through the systematic inclusion of standards, blanks and check assays. Mr. Rose is responsible for developing the mine production schedule and participating in the resource estimate. Mr. Elfen of Ausenco Vector is responsible for information about environmental liabilities, environmental permitting and the geotechnical designs used for the study. Mr. Jemielita is responsible for information about the geological setting, deposit types, mineralization, exploration and drilling. Ms. Altman, Samuel Engineering, is the principal author of the report with specific responsibility for mineral processing and metallurgical testing, the capital and operating cost estimates, and the economic evaluation.

Mineral resources are generated using ordinary kriging with a nominal block size of 20 by 20 by 15 metres. Block grade estimates are derived from drill hole sample results and the interpretation of a geologic model, which relates to the spatial distribution of copper, gold, silver and molybdenum in the deposit. There are a total of 114 drill holes in Los Azules database with a cumulative length of 30,997 metres and a total of 15,260 samples analyzed for a suite of elements, including total copper, gold, silver and molybdenum. A total of 58 of the drill holes have some portion of the sample intervals tested for sequential copper analysis. This information contributed to the development of the mineral zone domains. The portion of the new mineral resource that has been defined as indicated is based on a drilling configuration that exhibits the degree of continuity required for higher-level mineral resources. Inferred mineral resources are limited to blocks within a maximum distance of 200 metres from a drill hole. As required by NI 43-101, the possible future economic viability of the mineral resource has been exhibited by restriction within a pit shell derived about the copper content in indicated and inferred class blocks at a copper price of $2.50 per pound, total operating costs of $5.25 per tonne and an average pit slope of 34 degrees. Mineral resources are presented at a cut-off grade of 0.35 per cent copper, which is the same base cut-off grade used in the 2008 mineral resource estimate. These are mineral resources, not mineral reserves.

For further information in respect of Los Azules project, please refer to the technical report entitled, "Canadian National Instrument 43-101 technical report, updated preliminary assessment, Los Azules project, San Juan province, Argentina," dated Dec. 1, 2010. This report will be made available on SEDAR concurrent with the filing of this news release.

We seek Safe Harbor.
Enhanced by Zemanta