Pages

Tuesday, May 14, 2013

TNR Gold - McEwen Mining: Drilling Expands New Central Zone at El Gallo 1 Mine MUX, TNR.v



TNR Gold: McEwen reckons gold stocks will rise in 2013 MUX, TNR.v

 "Action with McEwen Mining was quite interesting this week and, particularly, on Friday. Stock has refused to follow the Gold that day and stubbornly was climbing higher all day. Rob McEwen was making some of his magic on Thursday at the conference call after the Q1 update and McEwen Mining Shareholders meeting will be taken place next week. Chief Owner has promised release from one of the exploration program before it and Los Azules new resource estimate is due by the end of May. According to his facebook page, Rob was on the road last few weeks talking to numerous Investment Banks..."

TNR Gold - McEwen Mining: "Los Azules Copper final bids are due late Q2" MUX, TNR.v




McEwen Mining:

Drilling Expands New Central Zone at El Gallo 1 Mine

05/14/2013

TORONTO, ONTARIO--(Marketwired - May 14, 2013) - McEwen Mining Inc. (NYSE:MUX)(TSX:MUX) announces that follow-up core holes at the new Central Zone have expanded the gold mineralization in several directions. Central is located inside the Company's El Gallo 1 mine inSinaloa, Mexico (Fig. 1). It is situated between two known resources, where mining began onApril 1st (Fig. 2). Based on the results in this news release plus prior holes, there appears to be good potential to mine the area as one enlarged open pit rather than as two separate pits.
Table 1. El Gallo 1 Mine - Central Zone Drill Highlights
Drill holeFrom
(m)
To
(m)
Thickness
(m)
Gold Grade
(GPT)
Target TypeObjective
MLX079161.6181.820.22.7Open PitExtended at Depth
Including166.5167.61.118.0
MLX081117.4140.323.05.7Open PitExtended Along
Including118.2120.11.950.0Strike
Including129.1130.51.514.4
MLX08273.194.321.22.5Open PitInfill
Including90.093.93.99.5
Including90.091.01.017.5
MLX087171.8181.09.32.5Open PitExpanded at Depth
Including171.8173.11.314.0
MLX088171.5185.514.04.6Open PitExpanded at Depth
Including174.7178.74.011.7
MLX09082.4103.320.93.9Open PitExtended Along
Including90.192.12.012.2Strike
Including100.8101.60.826.5

Drilling in this release was focused on 3 objectives: 1) extending the zone at depth, 2) extending the strike or length of the zone and 3) infilling an area between the historical near-surface drilling and McEwen Mining's discovery holes.
1) Drilling Extends Central Zone at Depth - 4.6 gpt gold over 14.0 meters
Holes MLX079, MLX087 and MLX088 targeted mineralization below the initial discovery holes announced on April 11th, 2013 (Fig. 2, 3 & 4). These new holes successfully extended the zone by 50 meters to a total depth of 180 meters below surface. The zone remains open for further expansion. Significant intercepts include 2.7 gpt gold over 20.2 meters2.5 gpt gold over 9.3 meters and 4.6 gpt gold over 14.0 meters. An additional 3 holes have been drilled to extend the zone, with assays pending.
2) Strike (or length of the zone) Extended - 5.7 gpt gold over 23.0 meters
Holes MLX081, MLX085 and MLX090 were drilled southwest and northeast of the initial discovery holes, extending the strike or length of the zone by 30 meters to the northeast and 20 meters to the southwest (Fig. 2). Before drilling began at Central, the distance between the two resources where mining recently commenced was 1,000 meters. Based on these results and prior holes, the Company believes the area can be mined as one enlarged open pit. Highlights from this drilling included 5.7 gpt gold over 23.0 meters1.1 gpt gold over 20.5 meters and 3.9 gpt gold over 20.9 meters. An additional 6 holes have been drilled with assays pending.
3) Infilling Gaps & Reducing Strip - 2.5 gpt over 21.2 meters
The last objective with the recent holes was to infill an area between the historic, near surface drilling that tested for gold mineralization down to 20 meters (which encountered weak mineralization) and McEwen Mining's discovery holes, which start 80 meters below surface (Fig. 2, 3 & 4). The three holes from this area were in line with expectations, returning 2.5 gpt gold over 21.2 meters1.8 gpt over 12.1 meters and 0.8 gpt gold over 18.7 meters (Fig. 2, 3 & 4). This is an encouraging development as it shows the zone can be extended closer to surface, which should reduce the strip ratio. An additional 2 holes have been drilled with assays pending.
About El Gallo Complex
The El Gallo Complex is located in Sinaloa, Mexico. Phase 1 achieved commercial production in early January. It is forecasted to produce 30,000 ounces of gold per year. Phase 2, where a feasibility study was completed in 2012, is forecasted to add an additional 5,200,000 ounces of silver (105,000 ounces of gold equivalent) once in production. Combined, both phases are scheduled to produce approximately 135,000 ounces of gold equivalent annually.
About McEwen Mining ( www.mcewenmining.com )
The goal of McEwen Mining is to qualify for inclusion in the S&P 500 by 2015 by creating a profitable gold producer focused in the AmericasMcEwen Mining's principal assets consist of the San José mine in Santa CruzArgentina (49% interest); the El Gallo Complex in Sinaloa, Mexico; the Gold Bar project in Nevada, US; the Los Azules project in San JuanArgentina and a large portfolio of exploration properties in ArgentinaMexico and Nevada.
McEwen Mining has 297 million shares issued and outstanding. Rob McEwen , Chairman, President and Chief Owner, owns 25% of the shares of the Company (assuming all outstanding Exchangeable Shares are exchanged for an equivalent amount of Common Shares). As of April 29, 2012McEwen Mining had cash and liquid assets of approximately US$50 million and is debt free.
TECHNICAL INFORMATION:
This news release has been viewed and approved by John Read , CPG, McEwen Mining'sconsulting geologist, who is a Qualified Person as defined by National Instrument 43-101 and is responsible for program design and quality control of exploration undertaken by the Company at its Mexican exploration properties. Samples from the core drilling were split on-site at theCompany's El Gallo Complex. One half of the split drill core is shipped to ALS Chemex for sample preparation and analysis by fire assay for gold and 4-acid digestion with ICP determination for silver. Samples returning greater than 10 ppm gold or 1500 ppm silver were re-analyzed using gravimetric fire assay. Standards and blanks were inserted every 20 samples. All holes were drilled with HQ bits and reduced to NTW where required. Samples were taken based on lithologic and/or mineralized intervals and vary in length. The true width of the mineral zone has not been determined. For additional information see the technical report titled "El Gallo Complex Phase II Project, NI 43-101 Technical Report Feasibility Study, Mocorito Municipality, Sinaloa, Mexico" with an effective date of September 10, 2012, prepared by M3 Engineering along with a team of associates (the "Phase II Report"). The Phase II Report is available under the Corporation's profile on SEDAR (www.sedar.com). The authors of the Phase 2 Report, Stan Timler - M3 Engineering, Mike Hester - Independent Mining Consultants (Reserves), Dawn Garcia - SRK Consulting (Environmental), Richard Kehmeier and Brian Hartman - Pincock Allen & Holt (El Gallo Deposit Resource), John Read - McEwen Mining consultant (Palmarito In Situ, Historic Waste Dumps and Historic Tailings Resource), all of whom are qualified persons and all of whom butJohn Read are independent of McEwen Mining, each as defined by NI 43-101.
CAUTIONARY NOTE TO US INVESTORS
McEwen Mining prepares its resource estimates in accordance with standards of the Canadian Institute of Mining, Metallurgy and Petroleum referred to in Canadian National Instrument 43-101 (NI 43-101). These standards are different from the standards generally permitted in reports filed with the SEC. Under NI 43-101, McEwen Mining reports measured, indicated and inferred resources, measurements which are generally not permitted in filings made with the SEC. The estimation of measured resources and indicated resources involve greater uncertainty as to their existence and economic feasibility than the estimation of proven and probable reserves. U.S. investors are cautioned not to assume that any part of measured or indicated resources will ever be converted into economically mineable reserves. The estimation of inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources.
CAUTION CONCERNING FORWARD-LOOKING STATEMENTS
This news release contains certain forward-looking statements and information, including "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this news release, McEwen Mining Inc.'s (the "Company") estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements and information are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements and information include, but are not limited to, factors associated with fluctuations in the market price of precious metals, mining industry risks, political, economic, social and security risks associated with foreign operations, risks associated with the construction of mining operations and commencement of production and the projected costs thereof, risks related to litigation, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves and other risks. Readers should not place undue reliance on forward-looking statements or information included herein, which speak only as of the date hereof. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See McEwen Mining's Annual Report on Form 10-K for the fiscal year ended December 31, 2012 and other filings with the Securities and Exchange Commission, under the caption "Risk Factors", for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information regarding the Company. All forward-looking statements and information made in this news release are qualified by this cautionary statement.
Table 2. El Gallo 1 Mine - Drill Hole Results
HoleFrom
(meters)
To
(meters)
Thickness
(meters)
Gold Grade
(Grams per Tonne)
Dip (1)
(Degrees)
Azimuth (2)
(Degrees)
Easting (3)
(UTM)
Northing (3)
(UTM)
MLX079161.6181.820.22.7-503252170352825753
Including166.5167.61.118.0
MLX080118.6130.411.81.0-503252175502836073
MLX081117.4140.323.05.7-503252170002836073
Including118.2120.11.950.0
Including129.1130.51.514.4
MLX08273.194.321.22.5-50325216993283580
Including90.093.93.99.5
Including90.091.01.017.5
MLX08396.897.60.93.7-50325217098283585
MLX08448.166.818.70.8-50325217045283583
MLX085127.8148.320.51.1-50325217081283578
MLX086-----553252176252836005
MLX087171.8181.09.32.5-503252170852835735
Including171.8173.11.314.0
MLX088171.5185.514.04.6-503252170542835730
Including174.7178.74.011.7
MLX08955.367.412.11.8-503252170102835842
MLX09082.4103.320.93.9-503252169872835780
Including90.192.12.012.2
Including100.8101.60.826.5
(1) Dip = Angle of drill hole, (2) Azimuth = Direction of drill hole, (3) Coordinate

To view "Figure 1", please visit the following

link: http://media3.marketwire.com/docs/MUX05142013F1.pdf.

To view "Figure 2", please visit the following

link: http://media3.marketwire.com/docs/MUX05142013F2.pdf.

To view "Figure 3", please visit the following

link: http://media3.marketwire.com/docs/MUX05142013F3.pdf.

To view "Figure 4", please visit the following link: http://media3.marketwire.com/docs/MUX05142013F4.pdf.

The NYSE and TSX have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by management ofMcEwen Mining Inc.
Contact Information:
McEwen Mining Inc.
Jenya Meshcheryakova
Investor Relations
(647) 258-0395 ext 410 or Toll Free: (866) 441-0690
(647) 258-0408 (FAX)

McEwen Mining Inc.
Mailing Address
181 Bay Street Suite 4750
Toronto, ON M5J 2T3
PO box 792
info@mcewenmining.com

Facebookwww.facebook.com/mcewenrob
Twitter: www.twitter.com/mcewenmining
Store: www.mcewenmining.com/store"


Please Note our Legal Disclaimer on the Blog, including, but Not limited to:


There are NO Qualified Persons among the authors of this blog as it is defined by NI 43-101, we were NOT able to verify and check any provided information in the articles, news releases or on the links embedded on this blog; you must NOT rely in any sense on any of this information in order to make any resource or value calculation, or attribute any particular value or Price Target to any discussed securities.


We Do Not own any content in the third parties' articles, news releases, videos or on the links embedded on this blog; any opinions - including, but not limited to the resource estimations, valuations, target prices and particular recommendations on any securities expressed there - are subject to the disclosure provided by those third parties and are NOT verified, approved or endorsed by the authors of this blog in any way.

Please, do not forget, that we own stocks we are writing about and have position in these companies. We are not providing any investment advice on this blog and there is no solicitation to buy or sell any particular company.
Enhanced by Zemanta

No comments:

Post a Comment